Oakland Army Base – Caltrans Relocation
Focon furnished and installed wet utilities for Caltrans Laydown Yard, which included water lines, sanitary sewer lines, storm draining lines […]
Focon furnished and installed wet utilities for Caltrans Laydown Yard, which included water lines, sanitary sewer lines, storm draining lines […]
Focon Repaired trails, repaved existing parking lot, improved signage and installed prefabricated restroom and drinking fountain as general contractor.
Focon installed a storm drain system at the approach to the Bay Bridge which included reinforced concrete pipe and drain
Focon installed the rebar, set anchor bolts and poured concrete for 136 canopies as a subcontractor.
The Mandela Transit Village project is a $900 million, multiphase office, housing and retail development located around the West Oakland
New construction and tenant improvements were performed in a Cahill/Focon Joint-Venture at Calvin Simmons Middle school in Oakland in two