Oakland Army Base – Caltrans Relocation

Focon furnished and installed wet utilities for Caltrans Laydown Yard, which included water lines, sanitary sewer lines, storm draining lines and pump station as a subcontractor.
Trail Renovation Sibley/Huckleberry Regional Preserve

Focon Repaired trails, repaved existing parking lot, improved signage and installed prefabricated restroom and drinking fountain as general contractor.
East Span of the San Francisco-Oakland Bay Bridge

Focon installed a storm drain system at the approach to the Bay Bridge which included reinforced concrete pipe and drain inlets as a subcontractor.
Oakland International Airport Roadways and Curbsides

Focon installed the rebar, set anchor bolts and poured concrete for 136 canopies as a subcontractor.